Fees and resourcing on design and construction projects
This article needs more work. To help develop this article, click 'Edit this article'.
Contents |
[edit] Calculation
Fees can have impact on client's perception of a company and so it is important to get them right.
They can be based on:
- Empirical data: practice records of previous costs.
- Calculating the cost of the resource and other requirements (renders,printing, travel etc…) of the project on stage by stage basis.
- A tool such as the RIBA fee calculator based on the cost of the resource and other requirements.
[edit] Types of fee
Fees calculated as a percentage of the final construction cost:
- Suits straightforward building projects of relatively short duration.
- Can appear to reward design consultants for an overpriced design.
- Risk to the consultants that the construction cost could be lower than anticipated.
- Can be used as a basis for fee calculation rather than a 'set in stone' agreement.
- Appropriate when the scope of the project/ required services/ programme and cost clearly defined from outset and are unlikely to change.
- It is possible to agree lump sum separately for each work stage.
- Variations may allow additional fees.
Time charges:
- Appropriate when resources or time scale cannot be predicted accurately. This is often the case in the early stages of a project.
- An agreed hourly rate per staff category / named individual.
- May include a provision for increases with inflation (12 monthly).
Additional fees:
- Standard appointments generally have provision for additional fees.
- Beware of bespoke appointments that limit additional fees to client instructions.
- Licence fees for the design if the developer uses it on other sites.
[edit] Risks and uncertainties
- Client experience/ knowledge/ reputation/relationship. It may be appropriate to carry out a credit check and speak to other firms to find out how quickly they pay/ whether they observe payment terms and so on.
- Project definition: Are the requirements clear or uncertain?
- Scale of project: Impacts planning timescales/ resource/ programme.
- Complexity of the project.
- Whether similar work has been done before.
- Programme: scale/ planning/ resource/ uncertainties such as repairs for survey/squatters.
- Other resource requirements: if a project is overseas, it may be appropriate to work with a local consultant to benefit from their knowledge.
- Local opposition/support
- Requirement to appoint sub-consultants
[edit] Key influences on resource requirements
- Type of procurement and scope of services.
- Speed
- Quality
- Project size
- Complexity
- Extent of works to existing buildings
- Repair / conservation of historic buildings
- Degree of design repetition
- Practice size and overheads
- Geographic proximity
- BIM
[edit] Benefits
- Business expansion.
- Enhanced profit.
- Employ existing staff
- New market/sector
- Quality of work
- Prestige/enhanced reputation
[edit] Key influences on brand value
- Practice reputation.
- Location.
- Culture.
- Specialist skills.
[edit] Context/benchmarking
Whilst using the points above to aid a resource-based approach to calculate feed, cross-checks are recommended to ensure that a sensible outcome has been reached. Such checks include comparing the fee to be proposed against previous similar jobs and benchmarking the proposed fee against other projects when expressed as a percentage of construction cost.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.
ECA shares advice for those who may be exposed to risks.
How to revolutionise UK housing with MMC
CIC and Supply Chain Sustainability School unveil a plan.
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
New Floods Resilience Taskforce
With a wet met office autumn prediction.